10 mm TPO Centre Consoles Manufacturer for Cleaning And Sanitation Equipment

10 mm TPO Centre Consoles Manufacturer for Cleaning And Sanitation Equipment

10 mm TPO centre consoles manufactured for cleaning and sanitation equipment: TPO sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.

Free Quote

These TPO centre consoles are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from TPO sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationcleaning and sanitation equipment
MaterialTPO
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, silk screened markings, pad printed logos
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • TPO keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • machine covers
  • tool trays
  • scrubber tanks
  • solution tank liners
  • centre consoles used across general cleaning and sanitation equipment builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming centre consoles from TPO sheet

Material: TPO

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • clear protective film
  • silk screened markings
  • pad printed logos
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • PPAP or ISIR on request
  • dimension reports with every release
  • REACH compliant sheet available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message