OEM Equipment Covers flame retardant ABS in 2 mm for Ev Charging

OEM Equipment Covers flame retardant ABS in 2 mm for Ev Charging

2 mm flame retardant ABS equipment covers manufactured for EV charging: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 2-3 weeks.

Free Quote

These flame retardant ABS equipment covers are thick gauge vacuum formed parts supplied to drawing for EV charging. They are formed from flame retardant ABS sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

equipment covers

Product specification

ItemValue
Productequipment covers
Typical applicationEV charging
Materialflame retardant ABS
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmould texture, EMI shielding coating, pad printed logos
Minimum order50 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • flame retardant ABS keeps the weight down while stiffness is held through the formed shape
  • Mould texture finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • wallbox covers
  • cable management panels
  • charger housings
  • payment terminal bezels
  • equipment covers used across general EV charging builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming equipment covers from flame retardant ABS sheet

Material: flame retardant ABS

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • mould texture
  • EMI shielding coating
  • pad printed logos
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • ISO 9001 quality system
  • UL94 V-0 grades available
  • REACH compliant sheet available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed equipment covers ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current equipment covers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message