Thick Gauge flame retardant ABS Splash Guards in 1.5 mm – Cleaning And Sanitation Equipment Range

Thick Gauge flame retardant ABS Splash Guards in 1.5 mm – Cleaning And Sanitation Equipment Range

1.5 mm flame retardant ABS splash guards manufactured for cleaning and sanitation equipment: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 3-4 wee

Free Quote

These flame retardant ABS splash guards are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from flame retardant ABS sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

splash guards

Product specification

ItemValue
Productsplash guards
Typical applicationcleaning and sanitation equipment
Materialflame retardant ABS
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsas formed gloss, pad printed logos, UV stabilised as formed
Minimum order50 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • flame retardant ABS keeps the weight down while stiffness is held through the formed shape
  • As formed gloss finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • solution tank liners
  • tool trays
  • scrubber tanks
  • machine covers
  • splash guards used across general cleaning and sanitation equipment builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming splash guards from flame retardant ABS sheet

Material: flame retardant ABS

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • as formed gloss
  • pad printed logos
  • UV stabilised as formed
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • food contact declarations available
  • REACH compliant sheet available
  • dimension reports with every release

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed splash guards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message