Protective Guards 6 mm polycarbonate Supplier for Textile Machinery Equipment

Protective Guards 6 mm polycarbonate Supplier for Textile Machinery Equipment

6 mm polycarbonate protective guards manufactured for textile machinery: polycarbonate sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.

Free Quote

These polycarbonate protective guards are thick gauge vacuum formed parts supplied to drawing for textile machinery. They are formed from polycarbonate sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationtextile machinery
Materialpolycarbonate
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionshot stamped accents, satin finish, anti static coating
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • polycarbonate keeps the weight down while stiffness is held through the formed shape
  • Hot stamped accents finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • machine side covers
  • guard panels
  • lint trays
  • thread guide covers
  • protective guards used across general textile machinery builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming protective guards from polycarbonate sheet

Material: polycarbonate

Polycarbonate is used when the housing must survive impact or carry a glazing function. It must be dried before forming or the sheet will bubble.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • hot stamped accents
  • satin finish
  • anti static coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • dimension reports with every release
  • UL94 V-0 grades available
  • food contact declarations available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message