HIPS Centre Consoles Vacuum Formed in 10 mm for Animal Husbandry

HIPS Centre Consoles Vacuum Formed in 10 mm for Animal Husbandry

10 mm HIPS centre consoles manufactured for animal husbandry: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 10-15 working days.

Free Quote

These HIPS centre consoles are thick gauge vacuum formed parts supplied to drawing for animal husbandry. They are formed from HIPS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationanimal husbandry
MaterialHIPS
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, silk screened markings, matte finish
Minimum order10 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HIPS keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • food contact declarations available

Typical applications

  • pen panels
  • poultry trays
  • feed hoppers
  • water trough liners
  • centre consoles used across general animal husbandry builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming centre consoles from HIPS sheet

Material: HIPS

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • clear protective film
  • silk screened markings
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • food contact declarations available
  • REACH compliant sheet available
  • material certificates with every batch

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message