Hoods TPO in 6 mm for Telecom And Network Cabinets – Formed to Drawing

Hoods TPO in 6 mm for Telecom And Network Cabinets – Formed to Drawing

6 mm TPO hoods manufactured for telecom and network cabinets: TPO sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 2-3 weeks.

Free Quote

These TPO hoods are thick gauge vacuum formed parts supplied to drawing for telecom and network cabinets. They are formed from TPO sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoods

Product specification

ItemValue
Producthoods
Typical applicationtelecom and network cabinets
MaterialTPO
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmould texture, two coat polyurethane paint, powder coat finish
Minimum order25 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • TPO keeps the weight down while stiffness is held through the formed shape
  • Mould texture finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • cable trays
  • antenna radomes
  • equipment shelves
  • cabinet tops
  • hoods used across general telecom and network cabinets builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming hoods from TPO sheet

Material: TPO

TPO sheet is used where the part lives outdoors: it stays flexible in the cold and resists UV without a coating.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • mould texture
  • two coat polyurethane paint
  • powder coat finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • REACH compliant sheet available
  • RoHS compliant grades available
  • UL94 V-0 grades available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed hoods ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current hoods with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message