OEM Splash Guards polypropylene in 6 mm for Signage And Wayfinding

OEM Splash Guards polypropylene in 6 mm for Signage And Wayfinding

6 mm polypropylene splash guards manufactured for signage and wayfinding: polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 10-15 working days.

Free Quote

These polypropylene splash guards are thick gauge vacuum formed parts supplied to drawing for signage and wayfinding. They are formed from polypropylene sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

splash guards

Product specification

ItemValue
Productsplash guards
Typical applicationsignage and wayfinding
Materialpolypropylene
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionstwo coat polyurethane paint, powder coat finish, as formed gloss
Minimum order100 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • polypropylene keeps the weight down while stiffness is held through the formed shape
  • Two coat polyurethane paint finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • sign faces
  • direction panel shells
  • light box covers
  • post caps
  • splash guards used across general signage and wayfinding builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming splash guards from polypropylene sheet

Material: polypropylene

Polypropylene survives repeated impact and most cleaning chemicals. Its low forming temperature keeps cycles short, but it shrinks more, so the mould is cut with the shrink factor built in.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • plan the trim line on a flat face so the router can hold tolerance
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • two coat polyurethane paint
  • powder coat finish
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • food contact declarations available
  • REACH compliant sheet available
  • material certificates with every batch

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed splash guards ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Request a quotation

Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message