1.5 mm HIPS control panels manufactured for industrial robotics: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 3-4 weeks.

Free Quote

These HIPS control panels are thick gauge vacuum formed parts supplied to drawing for industrial robotics. They are formed from HIPS sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

control panels

Product specification

ItemValue
Productcontrol panels
Typical applicationindustrial robotics
MaterialHIPS
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssoft touch coating, two coat polyurethane paint, matte finish
Minimum order10 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HIPS keeps the weight down while stiffness is held through the formed shape
  • Soft touch coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • cable trays
  • teach pendant cases
  • controller housings
  • robot base covers
  • control panels used across general industrial robotics builds

How it is made

  1. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming control panels from HIPS sheet

Material: HIPS

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • plan the trim line on a flat face so the router can hold tolerance
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • soft touch coating
  • two coat polyurethane paint
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • material certificates with every batch
  • REACH compliant sheet available
  • ISO 9001 quality system

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed control panels ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current control panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message