Protective Guards flame retardant ABS in 5 mm for Commercial Laundry – Formed to Drawing

Protective Guards flame retardant ABS in 5 mm for Commercial Laundry – Formed to Drawing

5 mm flame retardant ABS protective guards manufactured for commercial laundry: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 10-15 working days.

Free Quote

These flame retardant ABS protective guards are thick gauge vacuum formed parts supplied to drawing for commercial laundry. They are formed from flame retardant ABS sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationcommercial laundry
Materialflame retardant ABS
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmould texture, EMI shielding coating, hot stamped accents
Minimum order10 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • flame retardant ABS keeps the weight down while stiffness is held through the formed shape
  • Mould texture finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • drum covers
  • control bezels
  • detergent tray liners
  • machine front panels
  • protective guards used across general commercial laundry builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming protective guards from flame retardant ABS sheet

Material: flame retardant ABS

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • mould texture
  • EMI shielding coating
  • hot stamped accents
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • PPAP or ISIR on request
  • material certificates with every batch
  • ISO 9001 quality system

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message