Thick Gauge ABS/PMMA Hoppers in 10 mm – Fitness Equipment Range

Thick Gauge ABS/PMMA Hoppers in 10 mm – Fitness Equipment Range

10 mm ABS/PMMA hoppers manufactured for fitness equipment: ABS/PMMA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 10-15 working days.

Free Quote

These ABS/PMMA hoppers are thick gauge vacuum formed parts supplied to drawing for fitness equipment. They are formed from ABS/PMMA sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoppers

Product specification

ItemValue
Producthoppers
Typical applicationfitness equipment
MaterialABS/PMMA
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssatin finish, matte finish, mould texture
Minimum order50 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PMMA keeps the weight down while stiffness is held through the formed shape
  • Satin finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • seat shells
  • console housings
  • treadmill motor covers
  • weight stack shrouds
  • hoppers used across general fitness equipment builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming hoppers from ABS/PMMA sheet

Material: ABS/PMMA

ABS/PMMA combines an ABS core with a hard acrylic cap, so the part has the toughness of ABS and the UV and scratch resistance of acrylic.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • satin finish
  • matte finish
  • mould texture
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • material certificates with every batch
  • ISO 9001 quality system
  • dimension reports with every release

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed hoppers ready for shipment

Frequently asked questions

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Request a quotation

Send the drawing or a photo of the current hoppers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message