Home / Product / Custom plastic manufacturing / Centre Consoles 8 mm polycarbonate Supplier for Rail Transit Interiors Equipment /
8 mm polycarbonate centre consoles manufactured for rail transit interiors: polycarbonate sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 3-4 weeks.
Free QuoteThese polycarbonate centre consoles are thick gauge vacuum formed parts supplied to drawing for rail transit interiors. They are formed from polycarbonate sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | centre consoles |
| Typical application | rail transit interiors |
| Material | polycarbonate |
| Standard gauge | 8 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | satin finish, EMI shielding coating, hot stamped accents |
| Minimum order | 1 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Polycarbonate is used when the housing must survive impact or carry a glazing function. It must be dried before forming or the sheet will bubble.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message