1.5 mm ABS/PMMA splash guards manufactured for telecom and network cabinets: ABS/PMMA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 7-15 working days.
Free QuoteThese ABS/PMMA splash guards are thick gauge vacuum formed parts supplied to drawing for telecom and network cabinets. They are formed from ABS/PMMA sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | splash guards |
| Typical application | telecom and network cabinets |
| Material | ABS/PMMA |
| Standard gauge | 1.5 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | two coat polyurethane paint, anti graffiti coating, mould texture |
| Minimum order | 50 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ABS/PMMA combines an ABS core with a hard acrylic cap, so the part has the toughness of ABS and the UV and scratch resistance of acrylic.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message