OEM Centre Consoles recycled HDPE in 8 mm for Hydroponics And Greenhouse

OEM Centre Consoles recycled HDPE in 8 mm for Hydroponics And Greenhouse

8 mm recycled HDPE centre consoles manufactured for hydroponics and greenhouse: recycled HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.

Free Quote

These recycled HDPE centre consoles are thick gauge vacuum formed parts supplied to drawing for hydroponics and greenhouse. They are formed from recycled HDPE sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationhydroponics and greenhouse
Materialrecycled HDPE
Standard gauge8 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmatte finish, as formed gloss, satin finish
Minimum order100 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • recycled HDPE keeps the weight down while stiffness is held through the formed shape
  • Matte finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • grow trays
  • reservoir liners
  • channel covers
  • seedling trays
  • centre consoles used across general hydroponics and greenhouse builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. The part cools on a jig so the shape is held while the material stabilises.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming centre consoles from recycled HDPE sheet

Material: recycled HDPE

Recycled HDPE sheet lowers material cost and supports sustainability targets, with mechanical properties close to virgin sheet for non critical parts.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • matte finish
  • as formed gloss
  • satin finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • PPAP or ISIR on request
  • REACH compliant sheet available
  • dimension reports with every release

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message