3 mm polycarbonate cart panels manufactured for beauty and spa equipment: polycarbonate sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 3-4 weeks.
Free QuoteThese polycarbonate cart panels are thick gauge vacuum formed parts supplied to drawing for beauty and spa equipment. They are formed from polycarbonate sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | cart panels |
| Typical application | beauty and spa equipment |
| Material | polycarbonate |
| Standard gauge | 3 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | hot stamped accents, silk screened markings, clear protective film |
| Minimum order | 10 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Polycarbonate is used when the housing must survive impact or carry a glazing function. It must be dried before forming or the sheet will bubble.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current cart panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.