Thick Gauge HDPE Splash Guards in 10 mm – Atv And Utv Range

Thick Gauge HDPE Splash Guards in 10 mm – Atv And Utv Range

10 mm HDPE splash guards manufactured for ATV and UTV: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 3-4 weeks.

Free Quote

These HDPE splash guards are thick gauge vacuum formed parts supplied to drawing for ATV and UTV. They are formed from HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

splash guards

Product specification

ItemValue
Productsplash guards
Typical applicationATV and UTV
MaterialHDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsEMI shielding coating, clear protective film, matte finish
Minimum order25 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Emi shielding coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • cargo box liners
  • hoods
  • fenders
  • dash panels
  • splash guards used across general ATV and UTV builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming splash guards from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • EMI shielding coating
  • clear protective film
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • RoHS compliant grades available
  • ISO 9001 quality system
  • material certificates with every batch

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed splash guards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message