OEM Centre Consoles food grade polypropylene in 6 mm for Battery Energy Storage

OEM Centre Consoles food grade polypropylene in 6 mm for Battery Energy Storage

6 mm food grade polypropylene centre consoles manufactured for battery energy storage: food grade polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 7-15 wor

Free Quote

These food grade polypropylene centre consoles are thick gauge vacuum formed parts supplied to drawing for battery energy storage. They are formed from food grade polypropylene sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationbattery energy storage
Materialfood grade polypropylene
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmatte finish, anti static coating, UV stabilised as formed
Minimum order25 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • food grade polypropylene keeps the weight down while stiffness is held through the formed shape
  • Matte finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • cabinet liners
  • battery pack covers
  • cell trays
  • vent shrouds
  • centre consoles used across general battery energy storage builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming centre consoles from food grade polypropylene sheet

Material: food grade polypropylene

Food grade polypropylene is used for trays, hoppers and liners that touch product, and it can be washed with caustic cleaners.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • matte finish
  • anti static coating
  • UV stabilised as formed
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • food contact declarations available
  • ISO 9001 quality system
  • dimension reports with every release

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message