Control Panels PVC in 5 mm for Truck And Bus – Formed to Drawing

Control Panels PVC in 5 mm for Truck And Bus – Formed to Drawing

5 mm PVC control panels manufactured for truck and bus: PVC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 7-15 working days.

Free Quote

These PVC control panels are thick gauge vacuum formed parts supplied to drawing for truck and bus. They are formed from PVC sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

control panels

Product specification

ItemValue
Productcontrol panels
Typical applicationtruck and bus
MaterialPVC
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsUV stabilised as formed, silk screened markings, as formed gloss
Minimum order25 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PVC keeps the weight down while stiffness is held through the formed shape
  • Uv stabilised as formed finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • bunk liners
  • interior trim panels
  • engine tunnel covers
  • stepwell panels
  • control panels used across general truck and bus builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming control panels from PVC sheet

Material: PVC

PVC sheet brings flame retardancy and chemical resistance at a low price, common in equipment covers and clean room panels.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • UV stabilised as formed
  • silk screened markings
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • PPAP or ISIR on request
  • material certificates with every batch
  • UL94 V-0 grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed control panels ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current control panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message