OEM Ventilation Shrouds ABS/PMMA in 1.5 mm for Signage And Wayfinding

OEM Ventilation Shrouds ABS/PMMA in 1.5 mm for Signage And Wayfinding

1.5 mm ABS/PMMA ventilation shrouds manufactured for signage and wayfinding: ABS/PMMA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 2-3 weeks.

Free Quote

These ABS/PMMA ventilation shrouds are thick gauge vacuum formed parts supplied to drawing for signage and wayfinding. They are formed from ABS/PMMA sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

ventilation shrouds

Product specification

ItemValue
Productventilation shrouds
Typical applicationsignage and wayfinding
MaterialABS/PMMA
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssoft touch coating, two coat polyurethane paint, UV stabilised as formed
Minimum order10 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PMMA keeps the weight down while stiffness is held through the formed shape
  • Soft touch coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • post caps
  • light box covers
  • direction panel shells
  • sign faces
  • ventilation shrouds used across general signage and wayfinding builds

How it is made

  1. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming ventilation shrouds from ABS/PMMA sheet

Material: ABS/PMMA

ABS/PMMA combines an ABS core with a hard acrylic cap, so the part has the toughness of ABS and the UV and scratch resistance of acrylic.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • plan the trim line on a flat face so the router can hold tolerance
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • soft touch coating
  • two coat polyurethane paint
  • UV stabilised as formed
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • RoHS compliant grades available
  • ISO 9001 quality system
  • UL94 V-0 grades available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed ventilation shrouds ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current ventilation shrouds with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message