10 mm recycled HDPE Centre Consoles Manufacturer for Refrigeration

10 mm recycled HDPE Centre Consoles Manufacturer for Refrigeration

10 mm recycled HDPE centre consoles manufactured for refrigeration: recycled HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.

Free Quote

These recycled HDPE centre consoles are thick gauge vacuum formed parts supplied to drawing for refrigeration. They are formed from recycled HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationrefrigeration
Materialrecycled HDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, EMI shielding coating, matte finish
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • recycled HDPE keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • inner liners
  • door panels
  • condensate trays
  • shelf trays
  • centre consoles used across general refrigeration builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming centre consoles from recycled HDPE sheet

Material: recycled HDPE

Recycled HDPE sheet lowers material cost and supports sustainability targets, with mechanical properties close to virgin sheet for non critical parts.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • clear protective film
  • EMI shielding coating
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • UL94 V-0 grades available
  • material certificates with every batch
  • PPAP or ISIR on request

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message