8 mm recycled HDPE cart panels manufactured for water treatment: recycled HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 3-4 weeks.
Free QuoteThese recycled HDPE cart panels are thick gauge vacuum formed parts supplied to drawing for water treatment. They are formed from recycled HDPE sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | cart panels |
| Typical application | water treatment |
| Material | recycled HDPE |
| Standard gauge | 8 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | EMI shielding coating, hot stamped accents, matte finish |
| Minimum order | 100 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Recycled HDPE sheet lowers material cost and supports sustainability targets, with mechanical properties close to virgin sheet for non critical parts.
Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current cart panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.