ASA Centre Consoles Vacuum Formed in 3 mm for Animal Husbandry

ASA Centre Consoles Vacuum Formed in 3 mm for Animal Husbandry

3 mm ASA centre consoles manufactured for animal husbandry: ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 3-4 weeks.

Free Quote

These ASA centre consoles are thick gauge vacuum formed parts supplied to drawing for animal husbandry. They are formed from ASA sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationanimal husbandry
MaterialASA
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionshot stamped accents, as formed gloss, two coat polyurethane paint
Minimum order100 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ASA keeps the weight down while stiffness is held through the formed shape
  • Hot stamped accents finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • water trough liners
  • pen panels
  • feed hoppers
  • poultry trays
  • centre consoles used across general animal husbandry builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming centre consoles from ASA sheet

Material: ASA

ASA keeps its colour and surface under UV better than ABS, which suits outdoor covers that are not painted.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • plan the trim line on a flat face so the router can hold tolerance
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • hot stamped accents
  • as formed gloss
  • two coat polyurethane paint
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • ISO 9001 quality system
  • PPAP or ISIR on request
  • material certificates with every batch

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message