Component Trays 1.5 mm polypropylene Supplier for Food Processing Equipment

Component Trays 1.5 mm polypropylene Supplier for Food Processing Equipment

1.5 mm polypropylene component trays manufactured for food processing: polypropylene sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 7-15 working days.

Free Quote

These polypropylene component trays are thick gauge vacuum formed parts supplied to drawing for food processing. They are formed from polypropylene sheet at 1.5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationfood processing
Materialpolypropylene
Standard gauge1.5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmatte finish, soft touch coating, two coat polyurethane paint
Minimum order25 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • polypropylene keeps the weight down while stiffness is held through the formed shape
  • Matte finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • washdown panels
  • product trays
  • conveyor guards
  • mixer covers
  • component trays used across general food processing builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming component trays from polypropylene sheet

Material: polypropylene

Polypropylene survives repeated impact and most cleaning chemicals. Its low forming temperature keeps cycles short, but it shrinks more, so the mould is cut with the shrink factor built in.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • matte finish
  • soft touch coating
  • two coat polyurethane paint
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • material certificates with every batch
  • UL94 V-0 grades available
  • RoHS compliant grades available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message