Splash Guards 2 mm UV stabilised HDPE Supplier for Rail Transit Interiors Equipment

Splash Guards 2 mm UV stabilised HDPE Supplier for Rail Transit Interiors Equipment

2 mm UV stabilised HDPE splash guards manufactured for rail transit interiors: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 10-15 working days.

Free Quote

These UV stabilised HDPE splash guards are thick gauge vacuum formed parts supplied to drawing for rail transit interiors. They are formed from UV stabilised HDPE sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

splash guards

Product specification

ItemValue
Productsplash guards
Typical applicationrail transit interiors
MaterialUV stabilised HDPE
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, as formed gloss, EMI shielding coating
Minimum order1 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • ceiling end caps
  • seat shells
  • wall panels
  • luggage rack trays
  • splash guards used across general rail transit interiors builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming splash guards from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • clear protective film
  • as formed gloss
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • ISO 9001 quality system
  • dimension reports with every release
  • UL94 V-0 grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed splash guards ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current splash guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message