PMMA acrylic Component Trays Vacuum Formed in 6 mm for Animal Husbandry

PMMA acrylic Component Trays Vacuum Formed in 6 mm for Animal Husbandry

6 mm PMMA acrylic component trays manufactured for animal husbandry: PMMA acrylic sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 7-15 working days.

Free Quote

These PMMA acrylic component trays are thick gauge vacuum formed parts supplied to drawing for animal husbandry. They are formed from PMMA acrylic sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationanimal husbandry
MaterialPMMA acrylic
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, mould texture, EMI shielding coating
Minimum order5 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PMMA acrylic keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • poultry trays
  • water trough liners
  • pen panels
  • feed hoppers
  • component trays used across general animal husbandry builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming component trays from PMMA acrylic sheet

Material: PMMA acrylic

PMMA gives the glossiest surface and the best UV stability, which is why it is used for light housings and outdoor sign faces.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • clear protective film
  • mould texture
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • PPAP or ISIR on request
  • dimension reports with every release
  • RoHS compliant grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message