Tank Covers HDPE in 8 mm for Construction Machinery – Formed to Drawing

Tank Covers HDPE in 8 mm for Construction Machinery – Formed to Drawing

8 mm HDPE tank covers manufactured for construction machinery: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 working days.

Free Quote

These HDPE tank covers are thick gauge vacuum formed parts supplied to drawing for construction machinery. They are formed from HDPE sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

tank covers

Product specification

ItemValue
Producttank covers
Typical applicationconstruction machinery
MaterialHDPE
Standard gauge8 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmatte finish, satin finish, two coat polyurethane paint
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Matte finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • engine covers
  • guard shells
  • cab panels
  • toolbox liners
  • tank covers used across general construction machinery builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming tank covers from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • plan the trim line on a flat face so the router can hold tolerance
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • matte finish
  • satin finish
  • two coat polyurethane paint
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • RoHS compliant grades available
  • food contact declarations available
  • UL94 V-0 grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed tank covers ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current tank covers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message