OEM Component Trays PETG in 12 mm for Telecom And Network Cabinets

OEM Component Trays PETG in 12 mm for Telecom And Network Cabinets

12 mm PETG component trays manufactured for telecom and network cabinets: PETG sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 7-15 working days.

Free Quote

These PETG component trays are thick gauge vacuum formed parts supplied to drawing for telecom and network cabinets. They are formed from PETG sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationtelecom and network cabinets
MaterialPETG
Standard gauge12 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsEMI shielding coating, anti graffiti coating, mould texture
Minimum order1 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PETG keeps the weight down while stiffness is held through the formed shape
  • Emi shielding coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • antenna radomes
  • cable trays
  • cabinet tops
  • equipment shelves
  • component trays used across general telecom and network cabinets builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming component trays from PETG sheet

Material: PETG

PETG forms at a low temperature, holds detail well and is accepted for food contact, which suits trays, guards and machine covers in food plants.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • EMI shielding coating
  • anti graffiti coating
  • mould texture
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • material certificates with every batch
  • ISO 9001 quality system
  • PPAP or ISIR on request

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message