12 mm HIPS tank liners manufactured for motorcycle and scooter: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 2-3 weeks.
Free QuoteThese HIPS tank liners are thick gauge vacuum formed parts supplied to drawing for motorcycle and scooter. They are formed from HIPS sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | tank liners |
| Typical application | motorcycle and scooter |
| Material | HIPS |
| Standard gauge | 12 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | silk screened markings, matte finish, clear protective film |
| Minimum order | 10 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current tank liners with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message