PMMA acrylic Equipment Covers Vacuum Formed in 6 mm for Refrigeration

PMMA acrylic Equipment Covers Vacuum Formed in 6 mm for Refrigeration

6 mm PMMA acrylic equipment covers manufactured for refrigeration: PMMA acrylic sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.

Free Quote

These PMMA acrylic equipment covers are thick gauge vacuum formed parts supplied to drawing for refrigeration. They are formed from PMMA acrylic sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

equipment covers

Product specification

ItemValue
Productequipment covers
Typical applicationrefrigeration
MaterialPMMA acrylic
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionshot stamped accents, matte finish, as formed gloss
Minimum order100 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PMMA acrylic keeps the weight down while stiffness is held through the formed shape
  • Hot stamped accents finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • condensate trays
  • door panels
  • shelf trays
  • inner liners
  • equipment covers used across general refrigeration builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming equipment covers from PMMA acrylic sheet

Material: PMMA acrylic

PMMA gives the glossiest surface and the best UV stability, which is why it is used for light housings and outdoor sign faces.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • hot stamped accents
  • matte finish
  • as formed gloss
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • food contact declarations available
  • RoHS compliant grades available
  • REACH compliant sheet available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed equipment covers ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current equipment covers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message