LDPE Protective Guards Vacuum Formed in 12 mm for Telecom And Network Cabinets

LDPE Protective Guards Vacuum Formed in 12 mm for Telecom And Network Cabinets

12 mm LDPE protective guards manufactured for telecom and network cabinets: LDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 3-4 weeks.

Free Quote

These LDPE protective guards are thick gauge vacuum formed parts supplied to drawing for telecom and network cabinets. They are formed from LDPE sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationtelecom and network cabinets
MaterialLDPE
Standard gauge12 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsas formed gloss, hot stamped accents, clear protective film
Minimum order50 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • LDPE keeps the weight down while stiffness is held through the formed shape
  • As formed gloss finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • cable trays
  • equipment shelves
  • antenna radomes
  • cabinet tops
  • protective guards used across general telecom and network cabinets builds

How it is made

  1. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming protective guards from LDPE sheet

Material: LDPE

LDPE is flexible and tough in thin section, used for liners and protective covers that have to bend during fitting.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • as formed gloss
  • hot stamped accents
  • clear protective film
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • UL94 V-0 grades available
  • material certificates with every batch
  • dimension reports with every release

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message