HIPS Hoppers Vacuum Formed in 10 mm for Playground Equipment

HIPS Hoppers Vacuum Formed in 10 mm for Playground Equipment

10 mm HIPS hoppers manufactured for playground equipment: HIPS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 7-15 working days.

Free Quote

These HIPS hoppers are thick gauge vacuum formed parts supplied to drawing for playground equipment. They are formed from HIPS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

hoppers

Product specification

ItemValue
Producthoppers
Typical applicationplayground equipment
MaterialHIPS
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssoft touch coating, two coat polyurethane paint, silk screened markings
Minimum order100 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HIPS keeps the weight down while stiffness is held through the formed shape
  • Soft touch coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • panel covers
  • slide shells
  • climbing tower caps
  • seat buckets
  • hoppers used across general playground equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.

forming hoppers from HIPS sheet

Material: HIPS

HIPS is the low cost route for indoor liners and disposable trays where impact strength is not critical.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • avoid sharp steps in the mould, which show as chill marks on the finished surface

Finishing and assembly options

  • soft touch coating
  • two coat polyurethane paint
  • silk screened markings
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • material certificates with every batch
  • PPAP or ISIR on request
  • REACH compliant sheet available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed hoppers ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current hoppers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message