4 mm ESD safe ABS skid plates manufactured for hydroponics and greenhouse: ESD safe ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 2-3 weeks.
Free QuoteThese ESD safe ABS skid plates are thick gauge vacuum formed parts supplied to drawing for hydroponics and greenhouse. They are formed from ESD safe ABS sheet at 4 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | skid plates |
| Typical application | hydroponics and greenhouse |
| Material | ESD safe ABS |
| Standard gauge | 4 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | two coat polyurethane paint, EMI shielding coating, as formed gloss |
| Minimum order | 10 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ESD safe ABS keeps surface resistivity in the dissipative range, used for electronics carriers, tray systems and equipment covers in assembly areas.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current skid plates with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.