Fenders 2 mm PMMA acrylic Supplier for Cleaning And Sanitation Equipment Equipment

Fenders 2 mm PMMA acrylic Supplier for Cleaning And Sanitation Equipment Equipment

2 mm PMMA acrylic fenders manufactured for cleaning and sanitation equipment: PMMA acrylic sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 7-15 working days.

Free Quote

These PMMA acrylic fenders are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from PMMA acrylic sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

fenders

Product specification

ItemValue
Productfenders
Typical applicationcleaning and sanitation equipment
MaterialPMMA acrylic
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmould texture, anti graffiti coating, clear protective film
Minimum order100 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PMMA acrylic keeps the weight down while stiffness is held through the formed shape
  • Mould texture finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • tool trays
  • machine covers
  • solution tank liners
  • scrubber tanks
  • fenders used across general cleaning and sanitation equipment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. The part cools on a jig so the shape is held while the material stabilises.

forming fenders from PMMA acrylic sheet

Material: PMMA acrylic

PMMA gives the glossiest surface and the best UV stability, which is why it is used for light housings and outdoor sign faces.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • mould texture
  • anti graffiti coating
  • clear protective film
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • RoHS compliant grades available
  • ISO 9001 quality system
  • UL94 V-0 grades available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed fenders ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current fenders with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message