2 mm ABS/PC seat shells manufactured for catering and kitchen equipment: ABS/PC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 3-4 weeks.
Free QuoteThese ABS/PC seat shells are thick gauge vacuum formed parts supplied to drawing for catering and kitchen equipment. They are formed from ABS/PC sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | seat shells |
| Typical application | catering and kitchen equipment |
| Material | ABS/PC |
| Standard gauge | 2 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | as formed gloss, soft touch coating, satin finish |
| Minimum order | 5 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ABS/PC carries higher heat resistance than ABS alone, which matters for housings around motors, drives and power electronics.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current seat shells with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message