polycarbonate Component Trays Vacuum Formed in 6 mm for Cleaning And Sanitation Equipment

polycarbonate Component Trays Vacuum Formed in 6 mm for Cleaning And Sanitation Equipment

6 mm polycarbonate component trays manufactured for cleaning and sanitation equipment: polycarbonate sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 7-15 working days.

Free Quote

These polycarbonate component trays are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from polycarbonate sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationcleaning and sanitation equipment
Materialpolycarbonate
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti graffiti coating, satin finish, soft touch coating
Minimum order100 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • polycarbonate keeps the weight down while stiffness is held through the formed shape
  • Anti graffiti coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • scrubber tanks
  • solution tank liners
  • machine covers
  • tool trays
  • component trays used across general cleaning and sanitation equipment builds

How it is made

  1. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.

forming component trays from polycarbonate sheet

Material: polycarbonate

Polycarbonate is used when the housing must survive impact or carry a glazing function. It must be dried before forming or the sheet will bubble.

Design notes

  • use corner radii of at least three times the sheet thickness to avoid thinning
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • anti graffiti coating
  • satin finish
  • soft touch coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • RoHS compliant grades available
  • dimension reports with every release
  • PPAP or ISIR on request

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message