10 mm flame retardant ABS cowls manufactured for cleaning and sanitation equipment: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 3-4 weeks.

Free Quote

These flame retardant ABS cowls are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from flame retardant ABS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

cowls

Product specification

ItemValue
Productcowls
Typical applicationcleaning and sanitation equipment
Materialflame retardant ABS
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspowder coat finish, clear protective film, EMI shielding coating
Minimum order1 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • flame retardant ABS keeps the weight down while stiffness is held through the formed shape
  • Powder coat finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • dimension reports with every release

Typical applications

  • solution tank liners
  • tool trays
  • machine covers
  • scrubber tanks
  • cowls used across general cleaning and sanitation equipment builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  5. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.

forming cowls from flame retardant ABS sheet

Material: flame retardant ABS

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • plan the trim line on a flat face so the router can hold tolerance
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • powder coat finish
  • clear protective film
  • EMI shielding coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • RoHS compliant grades available
  • ISO 9001 quality system
  • UL94 V-0 grades available

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed cowls ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current cowls with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message