Thick Gauge ABS/PC Component Trays in 12 mm – Dental Equipment Range

Thick Gauge ABS/PC Component Trays in 12 mm – Dental Equipment Range

12 mm ABS/PC component trays manufactured for dental equipment: ABS/PC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 3-4 weeks.

Free Quote

These ABS/PC component trays are thick gauge vacuum formed parts supplied to drawing for dental equipment. They are formed from ABS/PC sheet at 12 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationdental equipment
MaterialABS/PC
Standard gauge12 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsUV stabilised as formed, as formed gloss, pad printed logos
Minimum order100 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PC keeps the weight down while stiffness is held through the formed shape
  • Uv stabilised as formed finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • food contact declarations available

Typical applications

  • suction unit housings
  • cabinet panels
  • chair shrouds
  • instrument tray covers
  • component trays used across general dental equipment builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  3. The part cools on a jig so the shape is held while the material stabilises.
  4. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming component trays from ABS/PC sheet

Material: ABS/PC

ABS/PC carries higher heat resistance than ABS alone, which matters for housings around motors, drives and power electronics.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • UV stabilised as formed
  • as formed gloss
  • pad printed logos
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • material certificates with every batch
  • UL94 V-0 grades available
  • RoHS compliant grades available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message