Protective Guards ABS/PC in 4 mm for Textile Machinery – Formed to Drawing

Protective Guards ABS/PC in 4 mm for Textile Machinery – Formed to Drawing

4 mm ABS/PC protective guards manufactured for textile machinery: ABS/PC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 10-15 working days.

Free Quote

These ABS/PC protective guards are thick gauge vacuum formed parts supplied to drawing for textile machinery. They are formed from ABS/PC sheet at 4 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

protective guards

Product specification

ItemValue
Productprotective guards
Typical applicationtextile machinery
MaterialABS/PC
Standard gauge4 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsmould texture, anti graffiti coating, clear protective film
Minimum order1 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PC keeps the weight down while stiffness is held through the formed shape
  • Mould texture finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • thread guide covers
  • machine side covers
  • lint trays
  • guard panels
  • protective guards used across general textile machinery builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming protective guards from ABS/PC sheet

Material: ABS/PC

ABS/PC carries higher heat resistance than ABS alone, which matters for housings around motors, drives and power electronics.

Design notes

  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance

Finishing and assembly options

  • mould texture
  • anti graffiti coating
  • clear protective film
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • REACH compliant sheet available
  • food contact declarations available
  • PPAP or ISIR on request

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed protective guards ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current protective guards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message