These LDPE tank liners are thick gauge vacuum formed parts supplied to drawing for animal husbandry. They are formed from LDPE sheet at 5 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

tank liners

Product specification

ItemValue
Producttank liners
Typical applicationanimal husbandry
MaterialLDPE
Standard gauge5 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsclear protective film, powder coat finish, silk screened markings
Minimum order100 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • LDPE keeps the weight down while stiffness is held through the formed shape
  • Clear protective film finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • REACH compliant sheet available

Typical applications

  • pen panels
  • water trough liners
  • feed hoppers
  • poultry trays
  • tank liners used across general animal husbandry builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming tank liners from LDPE sheet

Material: LDPE

LDPE is flexible and tough in thin section, used for liners and protective covers that have to bend during fitting.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • plan the trim line on a flat face so the router can hold tolerance
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • clear protective film
  • powder coat finish
  • silk screened markings
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • RoHS compliant grades available
  • food contact declarations available
  • material certificates with every batch

Packing and delivery

Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed tank liners ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current tank liners with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message