• Sales@ppoem.com
  • Beijing-time 08:00 am - 5:30 pm
OEM Centre Consoles ABS/PC in 8 mm for Cleaning And Sanitation Equipment

OEM Centre Consoles ABS/PC in 8 mm for Cleaning And Sanitation Equipment

8 mm ABS/PC centre consoles manufactured for cleaning and sanitation equipment: ABS/PC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.

Free Quote

These ABS/PC centre consoles are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from ABS/PC sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

centre consoles

Product specification

ItemValue
Productcentre consoles
Typical applicationcleaning and sanitation equipment
MaterialABS/PC
Standard gauge8 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti graffiti coating, EMI shielding coating, mould texture
Minimum order100 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • ABS/PC keeps the weight down while stiffness is held through the formed shape
  • Anti graffiti coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • solution tank liners
  • scrubber tanks
  • machine covers
  • tool trays
  • centre consoles used across general cleaning and sanitation equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming centre consoles from ABS/PC sheet

Material: ABS/PC

ABS/PC carries higher heat resistance than ABS alone, which matters for housings around motors, drives and power electronics.

Design notes

  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • anti graffiti coating
  • EMI shielding coating
  • mould texture
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • dimension reports with every release
  • ISO 9001 quality system
  • UL94 V-0 grades available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed centre consoles ready for shipment

Frequently asked questions

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

What quantity can I order?

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message