8 mm polycarbonate tank covers manufactured for solar and wind energy: polycarbonate sheet vacuum formed to drawing, 5-axis trimmed, MOQ 1 pieces, first article in 7-15 working days.
Free QuoteThese polycarbonate tank covers are thick gauge vacuum formed parts supplied to drawing for solar and wind energy. They are formed from polycarbonate sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | tank covers |
| Typical application | solar and wind energy |
| Material | polycarbonate |
| Standard gauge | 8 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | matte finish, hot stamped accents, as formed gloss |
| Minimum order | 1 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Polycarbonate is used when the housing must survive impact or carry a glazing function. It must be dried before forming or the sheet will bubble.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.
Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.