6 mm flame retardant ABS display shells manufactured for HVAC equipment: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 7-15 working days.
Free QuoteThese flame retardant ABS display shells are thick gauge vacuum formed parts supplied to drawing for HVAC equipment. They are formed from flame retardant ABS sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | display shells |
| Typical application | HVAC equipment |
| Material | flame retardant ABS |
| Standard gauge | 6 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | anti static coating, matte finish, as formed gloss |
| Minimum order | 50 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current display shells with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message