8 mm flame retardant ABS battery boxes manufactured for hydroponics and greenhouse: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 2-3 weeks.
Free QuoteThese flame retardant ABS battery boxes are thick gauge vacuum formed parts supplied to drawing for hydroponics and greenhouse. They are formed from flame retardant ABS sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | battery boxes |
| Typical application | hydroponics and greenhouse |
| Material | flame retardant ABS |
| Standard gauge | 8 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | mould texture, satin finish, two coat polyurethane paint |
| Minimum order | 100 pieces |
| Lead time to first article | 2–3 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Large panels are crated in made to measure wooden cases with corner protection. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

Sample quantities start at one piece off printed tooling. The process pays back from about 25 pieces a year and runs well into several thousand.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current battery boxes with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message