10 mm UV stabilised HDPE Machine Housings Manufacturer for Cleaning And Sanitation Equipment

10 mm UV stabilised HDPE Machine Housings Manufacturer for Cleaning And Sanitation Equipment

10 mm UV stabilised HDPE machine housings manufactured for cleaning and sanitation equipment: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 50 pieces, first article in 3-4 wee

Free Quote

These UV stabilised HDPE machine housings are thick gauge vacuum formed parts supplied to drawing for cleaning and sanitation equipment. They are formed from UV stabilised HDPE sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

machine housings

Product specification

ItemValue
Productmachine housings
Typical applicationcleaning and sanitation equipment
MaterialUV stabilised HDPE
Standard gauge10 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssatin finish, silk screened markings, clear protective film
Minimum order50 pieces
Lead time to first article3–4 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Satin finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • UL94 V-0 grades available

Typical applications

  • scrubber tanks
  • tool trays
  • machine covers
  • solution tank liners
  • machine housings used across general cleaning and sanitation equipment builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  3. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming machine housings from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • satin finish
  • silk screened markings
  • clear protective film
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • REACH compliant sheet available
  • material certificates with every batch
  • food contact declarations available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

packed machine housings ready for shipment

Frequently asked questions

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current machine housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message