10 mm flame retardant ABS hoppers manufactured for EV charging: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 3-4 weeks.
Free QuoteThese flame retardant ABS hoppers are thick gauge vacuum formed parts supplied to drawing for EV charging. They are formed from flame retardant ABS sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | hoppers |
| Typical application | EV charging |
| Material | flame retardant ABS |
| Standard gauge | 10 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | anti static coating, clear protective film, hot stamped accents |
| Minimum order | 10 pieces |
| Lead time to first article | 3–4 weeks |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.
First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.
Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 3–4 weeks, and repeat releases ship against stored tooling without a new proving run.

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Send the drawing or a photo of the current hoppers with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message