10 mm ABS/PC centre consoles manufactured for printing and packaging machinery: ABS/PC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 7-15 working days.
Free QuoteThese ABS/PC centre consoles are thick gauge vacuum formed parts supplied to drawing for printing and packaging machinery. They are formed from ABS/PC sheet at 10 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

| Item | Value |
|---|---|
| Product | centre consoles |
| Typical application | printing and packaging machinery |
| Material | ABS/PC |
| Standard gauge | 10 mm |
| Gauge range available | 1.5–12 mm |
| Maximum formed size | 3,000 × 2,000 mm |
| Formed tolerance | ±0.5 mm typical |
| Trim tolerance | ±0.2 mm on router cut edges |
| Draft angle | 3 degrees minimum, 5 degrees preferred |
| Finish options | anti static coating, matte finish, anti graffiti coating |
| Minimum order | 25 pieces |
| Lead time to first article | 7–15 working days |
| Tooling | aluminium production tool, composite or printed sample tool |
| Origin | China, export packed |

ABS/PC carries higher heat resistance than ABS alone, which matters for housings around motors, drives and power electronics.
Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.
Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.
Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.
Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.
Send the drawing or a photo of the current centre consoles with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.
Leave a Message