Thick Gauge UV stabilised HDPE Control Panels in 6 mm – Dental Equipment Range

Thick Gauge UV stabilised HDPE Control Panels in 6 mm – Dental Equipment Range

6 mm UV stabilised HDPE control panels manufactured for dental equipment: UV stabilised HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 2-3 weeks.

Free Quote

These UV stabilised HDPE control panels are thick gauge vacuum formed parts supplied to drawing for dental equipment. They are formed from UV stabilised HDPE sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

control panels

Product specification

ItemValue
Productcontrol panels
Typical applicationdental equipment
MaterialUV stabilised HDPE
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionstwo coat polyurethane paint, powder coat finish, matte finish
Minimum order10 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • UV stabilised HDPE keeps the weight down while stiffness is held through the formed shape
  • Two coat polyurethane paint finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • food contact declarations available

Typical applications

  • cabinet panels
  • chair shrouds
  • suction unit housings
  • instrument tray covers
  • control panels used across general dental equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming control panels from UV stabilised HDPE sheet

Material: UV stabilised HDPE

UV stabilised HDPE is the standard answer for outdoor tanks, agricultural hoppers and marine hardware that see direct sun.

Design notes

  • plan the trim line on a flat face so the router can hold tolerance
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly

Finishing and assembly options

  • two coat polyurethane paint
  • powder coat finish
  • matte finish
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • PPAP or ISIR on request
  • dimension reports with every release
  • food contact declarations available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed control panels ready for shipment

Frequently asked questions

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Request a quotation

Send the drawing or a photo of the current control panels with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message