OEM Dashboards PC/ASA in 2 mm for Printing And Packaging Machinery

OEM Dashboards PC/ASA in 2 mm for Printing And Packaging Machinery

2 mm PC/ASA dashboards manufactured for printing and packaging machinery: PC/ASA sheet vacuum formed to drawing, 5-axis trimmed, MOQ 10 pieces, first article in 2-3 weeks.

Free Quote

These PC/ASA dashboards are thick gauge vacuum formed parts supplied to drawing for printing and packaging machinery. They are formed from PC/ASA sheet at 2 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

dashboards

Product specification

ItemValue
Productdashboards
Typical applicationprinting and packaging machinery
MaterialPC/ASA
Standard gauge2 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspowder coat finish, pad printed logos, anti static coating
Minimum order10 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • PC/ASA keeps the weight down while stiffness is held through the formed shape
  • Powder coat finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • material certificates with every batch

Typical applications

  • feeder covers
  • control panels
  • waste bins
  • ink tray liners
  • dashboards used across general printing and packaging machinery builds

How it is made

  1. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  2. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  3. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. The sheet is formed over the mould with vacuum and, where the draw is deep, with plug assist.

forming dashboards from PC/ASA sheet

Material: PC/ASA

PC/ASA blends impact strength with weatherability, used for outdoor equipment covers that also need to survive knocks.

Design notes

  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • avoid sharp steps in the mould, which show as chill marks on the finished surface
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss

Finishing and assembly options

  • powder coat finish
  • pad printed logos
  • anti static coating
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch.

  • UL94 V-0 grades available
  • ISO 9001 quality system
  • food contact declarations available

Packing and delivery

Parts are stacked with interleaved film and packed in export cartons on pallets. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed dashboards ready for shipment

Frequently asked questions

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current dashboards with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message