Thick Gauge Kydex acrylic PVC Component Trays in 3 mm – Medical Equipment Range

Thick Gauge Kydex acrylic PVC Component Trays in 3 mm – Medical Equipment Range

3 mm Kydex acrylic PVC component trays manufactured for medical equipment: Kydex acrylic PVC sheet vacuum formed to drawing, 5-axis trimmed, MOQ 100 pieces, first article in 7-15 working days.

Free Quote

These Kydex acrylic PVC component trays are thick gauge vacuum formed parts supplied to drawing for medical equipment. They are formed from Kydex acrylic PVC sheet at 3 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

component trays

Product specification

ItemValue
Productcomponent trays
Typical applicationmedical equipment
MaterialKydex acrylic PVC
Standard gauge3 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionsanti static coating, satin finish, pad printed logos
Minimum order100 pieces
Lead time to first article7–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • Kydex acrylic PVC keeps the weight down while stiffness is held through the formed shape
  • Anti static coating finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • RoHS compliant grades available

Typical applications

  • dialysis machine covers
  • imaging equipment panels
  • device trolleys
  • monitor shrouds
  • component trays used across general medical equipment builds

How it is made

  1. The part cools on a jig so the shape is held while the material stabilises.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.
  4. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming component trays from Kydex acrylic PVC sheet

Material: Kydex acrylic PVC

Kydex acrylic PVC sheet is specified for interior trim that must resist scuffing and meet fire, smoke and toxicity rules.

Design notes

  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • plan the trim line on a flat face so the router can hold tolerance
  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time

Finishing and assembly options

  • anti static coating
  • satin finish
  • pad printed logos
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample. Batch releases carry a dimensional report, material certificate and, where agreed, PPAP or ISIR documentation.

  • PPAP or ISIR on request
  • food contact declarations available
  • UL94 V-0 grades available

Packing and delivery

Parts are nested to save freight, with returnable dunnage available on repeat routes. Standard lead time to first article is 7–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed component trays ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Request a quotation

Send the drawing or a photo of the current component trays with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message