flame retardant ABS Light Housings Vacuum Formed in 6 mm for Garden And Outdoor Power Equipment

flame retardant ABS Light Housings Vacuum Formed in 6 mm for Garden And Outdoor Power Equipment

6 mm flame retardant ABS light housings manufactured for garden and outdoor power equipment: flame retardant ABS sheet vacuum formed to drawing, 5-axis trimmed, MOQ 5 pieces, first article in 10-15 wo

Free Quote

These flame retardant ABS light housings are thick gauge vacuum formed parts supplied to drawing for garden and outdoor power equipment. They are formed from flame retardant ABS sheet at 6 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

light housings

Product specification

ItemValue
Productlight housings
Typical applicationgarden and outdoor power equipment
Materialflame retardant ABS
Standard gauge6 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionspowder coat finish, clear protective film, mould texture
Minimum order5 pieces
Lead time to first article10–15 working days
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • flame retardant ABS keeps the weight down while stiffness is held through the formed shape
  • Powder coat finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • ISO 9001 quality system

Typical applications

  • mower decks
  • grass catcher shells
  • engine covers
  • tool trays
  • light housings used across general garden and outdoor power equipment builds

How it is made

  1. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  2. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  3. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  4. The part cools on a jig so the shape is held while the material stabilises.
  5. Sheet is dried when the material needs it, then heated to forming temperature on the machine.

forming light housings from flame retardant ABS sheet

Material: flame retardant ABS

Flame retardant ABS is specified where the enclosure must meet UL94 V-0 or a comparable rail or appliance standard.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • use corner radii of at least three times the sheet thickness to avoid thinning
  • keep a draft angle of at least 3 degrees on vertical walls so the part releases cleanly
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist

Finishing and assembly options

  • powder coat finish
  • clear protective film
  • mould texture
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Moulds, trim fixtures and programmes are stored against the part number, so a repeat order matches the first batch. Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report.

  • REACH compliant sheet available
  • material certificates with every batch
  • ISO 9001 quality system

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 10–15 working days, and repeat releases ship against stored tooling without a new proving run.

packed light housings ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current light housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message