Machine Housings HDPE in 8 mm for Catering And Kitchen Equipment – Formed to Drawing

Machine Housings HDPE in 8 mm for Catering And Kitchen Equipment – Formed to Drawing

8 mm HDPE machine housings manufactured for catering and kitchen equipment: HDPE sheet vacuum formed to drawing, 5-axis trimmed, MOQ 25 pieces, first article in 2-3 weeks.

Free Quote

These HDPE machine housings are thick gauge vacuum formed parts supplied to drawing for catering and kitchen equipment. They are formed from HDPE sheet at 8 mm, trimmed on 5-axis routers and inspected against the drawing before packing. Buyers choose this route where a metal fabrication is too heavy, or where injection moulding tooling cannot be justified for the volume.

machine housings

Product specification

ItemValue
Productmachine housings
Typical applicationcatering and kitchen equipment
MaterialHDPE
Standard gauge8 mm
Gauge range available1.5–12 mm
Maximum formed size3,000 × 2,000 mm
Formed tolerance±0.5 mm typical
Trim tolerance±0.2 mm on router cut edges
Draft angle3 degrees minimum, 5 degrees preferred
Finish optionssatin finish, two coat polyurethane paint, hot stamped accents
Minimum order25 pieces
Lead time to first article2–3 weeks
Toolingaluminium production tool, composite or printed sample tool
OriginChina, export packed

Key features

  • One piece shell replaces a fabrication, so assembly hours drop
  • HDPE keeps the weight down while stiffness is held through the formed shape
  • Satin finish finish as standard, further finishes on request
  • Trimmed on 5-axis routers, so mounting holes and cut outs match the drawing
  • Tooling stored against the part number for repeat and spare orders
  • PPAP or ISIR on request

Typical applications

  • refrigerated well covers
  • service trolley trays
  • hood panels
  • bain marie liners
  • machine housings used across general catering and kitchen equipment builds

How it is made

  1. Drawings are reviewed and a manufacturability report is issued with wall thickness, draft and radii marked up.
  2. Trimming is done on 5-axis routers or with a dedicated trim fixture to meet the drawing.
  3. Parts are inspected, fitted with inserts or hardware if required, packed and shipped.
  4. Sheet is dried when the material needs it, then heated to forming temperature on the machine.
  5. Tooling is cut: aluminium for production volumes, composite or printed moulds for samples and first articles.

forming machine housings from HDPE sheet

Material: HDPE

HDPE is chosen for chemical resistance and impact strength at low temperature. It needs more heat and a longer cooling cycle than ABS, and it is painted only after flame or plasma treatment.

Design notes

  • add ribs or returns instead of increasing sheet thickness to save weight and cycle time
  • call out the finish on the drawing: mould texture, paint, or as-formed gloss
  • hold the draw ratio near 1:1 for deep parts, or specify plug assist
  • use corner radii of at least three times the sheet thickness to avoid thinning

Finishing and assembly options

  • satin finish
  • two coat polyurethane paint
  • hot stamped accents
  • Threaded inserts, PEM fasteners and brackets fitted before dispatch
  • Mating parts can be trial assembled before the first article ships

Quality

Sheet thickness is checked on the formed part at the points shown on the drawing, and the readings go into the report. First article inspection covers critical dimensions, wall thickness, colour and texture against the approved sample.

  • REACH compliant sheet available
  • PPAP or ISIR on request
  • food contact declarations available

Packing and delivery

Each part is bagged, edges protected with foam, then cartonised for container loading. Standard lead time to first article is 2–3 weeks, and repeat releases ship against stored tooling without a new proving run.

packed machine housings ready for shipment

Frequently asked questions

Are spare parts available later?

Tooling is stored against the part number for the life of the programme, so replacements or spare panels can be released at any time.

How fast is the first article?

Seven to fifteen working days from drawing release for sample tooling, with production tooling in three to four weeks.

Can you make it in another material?

Any grade in this family can be swapped in. Send the requirement and the material will be quoted with the price difference shown.

Request a quotation

Send the drawing or a photo of the current machine housings with the quantity and the finish required. The reply covers material choice, wall thickness, tooling route and price, so the decision is made on a complete picture.

Leave a Message